Skip to content

Catalog update [eda-openshift-operator] [v4.16,v4.17,v4.18,v4.19,v4.20,v4.21,v4.22]#8644

Draft
acornett21 wants to merge 1 commit into
redhat-openshift-ecosystem:mainfrom
acornett21:eda-openshift-fbc
Draft

Catalog update [eda-openshift-operator] [v4.16,v4.17,v4.18,v4.19,v4.20,v4.21,v4.22]#8644
acornett21 wants to merge 1 commit into
redhat-openshift-ecosystem:mainfrom
acornett21:eda-openshift-fbc

Conversation

@acornett21

Copy link
Copy Markdown
Contributor

No description provided.

Signed-off-by: Adam D. Cornett <adc@redhat.com>
@openshift-ci openshift-ci Bot added the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Jun 2, 2026
@rh-operator-bundle-bot rh-operator-bundle-bot changed the title onboard eda-openshift-operator to fbc Catalog update [eda-openshift-operator] [v4.16,v4.17,v4.18,v4.19,v4.20,v4.21,v4.22] Jun 2, 2026
@rh-operator-bundle-bot rh-operator-bundle-bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Jun 2, 2026
@rh-operator-bundle-bot

Copy link
Copy Markdown
Collaborator

@rh-operator-bundle-bot

Copy link
Copy Markdown
Collaborator

There were some errors while publishing your Operator Bundle. You can use this support case to contact the Red Hat certification team for review.

@rh-operator-bundle-bot

Copy link
Copy Markdown
Collaborator

Pipeline Summary

Pipeline: operator-hosted-pipeline
PipelineRun: operator-hosted-pipeline-runfqgxz
Start Time: 2026-06-02 17:40:59+00:00

Tasks

Status Task Start Time Duration
✔️ get-pr-number 2026-06-02 17:40:59+00:00 4 seconds
✔️ acquire-lease 2026-06-02 17:41:08+00:00 6 seconds
✔️ set-github-status-pending 2026-06-02 17:41:17+00:00 6 seconds
✔️ set-github-started-label 2026-06-02 17:41:18+00:00 7 seconds
✔️ set-env 2026-06-02 17:41:29+00:00 5 seconds
✔️ clone-repository-base 2026-06-02 17:41:37+00:00 a minute
✔️ clone-repository 2026-06-02 17:41:38+00:00 a minute
✔️ detect-changes 2026-06-02 17:42:58+00:00 11 seconds
✔️ read-config 2026-06-02 17:43:11+00:00 14 seconds
✔️ record-merge-base-lane-snapshot 2026-06-02 17:43:11+00:00 11 seconds
✔️ set-github-pr-title 2026-06-02 17:43:11+00:00 8 seconds
✔️ check-permissions 2026-06-02 17:43:11+00:00 29 seconds
✔️ static-tests 2026-06-02 17:43:12+00:00 22 seconds
✔️ content-hash 2026-06-02 17:43:12+00:00 28 seconds
✔️ get-organization 2026-06-02 17:43:13+00:00 17 seconds
✔️ certification-project-check 2026-06-02 17:43:13+00:00 21 seconds
✔️ get-pyxis-certification-data 2026-06-02 17:43:44+00:00 10 seconds
✔️ validate-catalog-format 2026-06-02 17:43:56+00:00 39 seconds
✔️ verify-project 2026-06-02 17:43:56+00:00 6 seconds
✔️ update-cert-project-status 2026-06-02 17:44:06+00:00 5 seconds
✔️ merge-registry-credentials 2026-06-02 17:44:14+00:00 7 seconds
✔️ digest-pinning 2026-06-02 17:44:22+00:00 15 seconds
✔️ build-fragment-images 2026-06-02 17:44:37+00:00 49 seconds
✔️ get-supported-versions 2026-06-02 17:44:40+00:00 11 seconds
✔️ get-ci-results-attempt 2026-06-02 17:44:52+00:00 8 seconds
✔️ preflight-trigger 2026-06-02 17:45:02+00:00 10 seconds
✔️ get-ci-results 2026-06-02 17:45:15+00:00 6 seconds
build-fbc-index-images 2026-06-02 17:45:27+00:00 2 minutes

Pipeline logs: https://gist.github.com/rh-operator-bundle-bot/d26ecbdf260b49e92805bbfcb4cd6abc

Troubleshooting

Please refer to the troubleshooting guide.

Run /pipeline restart operator-hosted-pipeline in case of pipeline failure to restart a pipeline.

@acornett21

Copy link
Copy Markdown
Contributor Author

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. operator-hosted-pipeline/failed

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants