Repository navigation
test(studio): inject a 45 ms stall per timeline scroll step to prove the gate fails it - #4848
Closed
miguel-heygen wants to merge 2 commits into
Closed
miguel-heygen wants to merge 2 commits into
miguel-heygen wants to merge 2 commits into
Conversation
Collaborator
Author
|
Sensitivity check done: with the 45 ms stall, the rollback arm's pooled p95 reached 89.0 ms and the gate failed it (run 36845468494). Numbers are in #4847. |
Edit accuracy: 530 passing here, 530 on the base branchThe gate passes. |
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Do not merge. A sensitivity check for #4847: this branch adds a fixed 45 ms main-thread stall to every timeline scroll step, so the timeline viewport gate must fail it on both arms. It will be closed once CI has run.