Repository navigation
docs: close CI parity and advance C5b19 recovery - #386
Merged
Merged
Conversation
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Close the recovery roadmap's CI parity item after #385 merged and #265 closed, then advance the next P1 item through a bounded C5b19 wire/record conformance increment in the existing experiment archive PR #38.
The archive increment validates exact 397-byte requests, 98-byte replies and 395-byte records using inert in-memory fixtures. It preserves the frozen source manifest and Go 1.25.13 offline toolchain. The canonical report records the exact archive source, tests, review history and remaining gates.
Full Gate 3 remains in progress. Native control, durable storage, the full trace oracle, child execution and product admission remain outside this slice. The historical initial-primitive review-3 claim has no recovered report and is not recertified by the new increment's review.
Verification
pnpm install --frozen-lockfile,make ci, and standalonepnpm testpassed: full Go suite and 177 workspace / 132 script tests, static checks, dependency audit, schema/ADR/site gates.golangci-lint run ./...still reports pre-existing quality: enforce exported contract documentation #217 revive debt (50 findings under the output cap, not the total backlog)..planning/c5b19-foundationand the recovery checkpoint.Exact delivery and review
2274a6c7c751ded537541438f473e81ccd293457; reviewed source:c4d3c33ed04c1dff213e2c69064a6113892d9653. The follow-up only records review acceptance.Hosted acceptance
Exact head
36bc83f46b404f9c4e508a582595c7ed430f58fc: CI 38803053712 and CodeQL 38803053865 passed. All applicable PR jobs succeeded; the nightly-only full suite was skipped by event policy. No duplicate or canceled run was present at final readback. Both working trees are clean and all retained commits are pushed to their named PR destinations.