Tracking issue for PR #130 (branch chore/holochain-0.7, draft).
Port is complete and green locally (all zomes build, happ packs, 39/39 Sweettest, UI typechecks). Blocked: requires the companion hREA PR merged first, since Nondominium vendors hREA and both Nondominium and R&O depend on it. Decision (2026-08-15): hREA moves to Holochain 0.7 first, targeted by the v0.1.0 release; Nondominium's upgrade lands after that unblocks.
Open items before merge: independent review of the integrity-zome validation diff, CI fix for the rsync permission error on .claude/skills/holochain, and the 0.7 launcher (launch-happ.mjs never reaches ready in CI). Note: 0.7 changes every DNA hash; conductor data must be cleared, no migration.
Tracking issue for PR #130 (branch
chore/holochain-0.7, draft).Port is complete and green locally (all zomes build, happ packs, 39/39 Sweettest, UI typechecks). Blocked: requires the companion hREA PR merged first, since Nondominium vendors hREA and both Nondominium and R&O depend on it. Decision (2026-08-15): hREA moves to Holochain 0.7 first, targeted by the v0.1.0 release; Nondominium's upgrade lands after that unblocks.
Open items before merge: independent review of the integrity-zome validation diff, CI fix for the rsync permission error on
.claude/skills/holochain, and the 0.7 launcher (launch-happ.mjsnever reaches ready in CI). Note: 0.7 changes every DNA hash; conductor data must be cleared, no migration.