Skip to content

Latest commit

 

History

History
192 lines (192 loc) · 20.3 KB

ResourceAssessmentSummaryData032011.csv

File metadata and controls

192 lines (192 loc) · 20.3 KB
1
RegionResource Assessment Site ID Site Name/Facility Design Head (feet) Design Flow (cfs) Installed Capacity (kW) Annual Production (MWh) Plant Factor Total Construction Cost (1,000 $) Annual O&M Cost (1,000 $) Cost per Installed Capacity ($/kW) Benefit Cost Ratio with Green IncentivesIRR with Green IncentivesBenefit Cost Ratio without Green IncentivesIRR without Green Incentives