Ether.fi weETH plugin #4346
Triggered via pull request
November 25, 2025 14:03
Status
Cancelled
Total duration
4m 50s
Artifacts
–
tests.yml
on: pull_request
Deployment Scripts
4m 44s
Lint Checks
48s
Plugin Unit Tests
4m 11s
Plugin Integration Tests (Mainnet) - 1/3
4m 43s
Plugin Integration Tests (Mainnet) - 2/3
4m 41s
Plugin Integration Tests (Mainnet) - 3/3
4m 39s
Plugin Integration Tests (Base)
3m 41s
Plugin Integration Tests (Arbitrum)
4m 12s
P0 tests
3m 53s
P1 Tests
4m 40s
Scenario Tests
2m 42s
Extreme Tests
4m 43s
Integration Tests
4m 42s
Monitor Tests (Mainnet)
2m 38s
Registry Tests
2m 1s
Oracle Factory Tests
2m 10s
Annotations
18 errors and 10 warnings
|
Lint Checks
Process completed with exit code 123.
|
|
|
|
Lint Checks:
contracts/plugins/assets/etherfi/KingAsset.sol#L67
Line length must be no more than 100 but current length is 106
|
|
Plugin Integration Tests (Mainnet) - 3/3
Canceling since a higher priority waiting request for Tests-refs/pull/1263/merge exists
|
|
Plugin Integration Tests (Mainnet) - 3/3
The operation was canceled.
|
|
P1 Tests
Canceling since a higher priority waiting request for Tests-refs/pull/1263/merge exists
|
|
P1 Tests
The operation was canceled.
|
|
Plugin Integration Tests (Mainnet) - 2/3
Canceling since a higher priority waiting request for Tests-refs/pull/1263/merge exists
|
|
Plugin Integration Tests (Mainnet) - 2/3
The operation was canceled.
|
|
Plugin Integration Tests (Mainnet) - 1/3
Canceling since a higher priority waiting request for Tests-refs/pull/1263/merge exists
|
|
Plugin Integration Tests (Mainnet) - 1/3
The operation was canceled.
|
|
Integration Tests
Canceling since a higher priority waiting request for Tests-refs/pull/1263/merge exists
|
|
Integration Tests
The operation was canceled.
|
|
Extreme Tests
Canceling since a higher priority waiting request for Tests-refs/pull/1263/merge exists
|
|
Extreme Tests
The operation was canceled.
|
|
Deployment Scripts
Canceling since a higher priority waiting request for Tests-refs/pull/1263/merge exists
|
|
Deployment Scripts
The operation was canceled.
|
|
Tests
Canceling since a higher priority waiting request for Tests-refs/pull/1263/merge exists
|
|
Lint Checks:
contracts/p0/Deployer.sol#L181
Code contains empty blocks
|
|
Lint Checks:
contracts/p0/AssetRegistry.sol#L144
Code contains empty blocks
|
|
Lint Checks:
contracts/facade/oracles/ReferenceRateOracle.sol#L33
Constant name must be in capitalized SNAKE_CASE
|
|
Lint Checks:
contracts/facade/oracles/ExchangeRateOracle.sol#L47
Constant name must be in capitalized SNAKE_CASE
|
|
Lint Checks:
contracts/facade/facets/RevenueFacet.sol#L113
Avoid to use inline assembly. It is acceptable only in rare cases
|
|
Lint Checks:
contracts/facade/facets/RevenueFacet.sol#L112
Variable name must be in mixedCase
|
|
Lint Checks:
contracts/facade/facets/RevenueFacet.sol#L47
Variable name must be in mixedCase
|
|
Lint Checks:
contracts/facade/Facade.sol#L37
Avoid to use inline assembly. It is acceptable only in rare cases
|
|
Lint Checks:
contracts/facade/Facade.sol#L32
Fallback function must be simple
|
|
Lint Checks:
contracts/facade/Facade.sol#L32
When fallback is not payable you will not be able to receive ether
|