Skip to content

Deno.cron Day-of-Week mismatch: Numeric weekdays off by one #21555

Open
denoland/docs
#3401

Description

@Hexagon

Version: Deno 1.38.5

There is an inconsistency with the numeric representation of weekdays in the Deno.cron function, it is off by one compared to standards.

Expected Behavior:

Based on conventional "system cron" logic (as detailed in the references listed below), the expression * * * * 3 should denote every minute of every Wednesday. This follows the typical numbering of days where Sunday is 0, Monday is 1, and so forth.

References:

Actual Behavior:

In Deno, the expression * * * * 4 is required to trigger events every minute on Wednesdays. This originates from the Rust crate saffron.

Saffron, as explained in a Cloudflare blog post, is influenced by the (Java) Quartz scheduler's cron parser. Quartz adopts a different standard where the week starts with 1 (Sunday) and ends with 7 (Saturday). This is also documented in saffron issue #19.

Concern:

The main concern is the adoption of Quartz's weekday numbering in Deno, which contradicts the more widely accepted system cron standard (0 for Sunday, 1 for Monday, etc.).

Alternative Solution:

In response to this (and other issues with existing Rust cron implementations), I have created an alternative crate, croner, which aims to align more closely with the standard cron behavior, and extend them with commonly adopted additional features. A detailed comparison between croner and the existing cron and saffron crates can be found at Why Croner instead of Cron or Saffron? (Disclaimer: This comparison is based on my own quick tests, as documentation for the other crates is limited.).

Activity

  1. added
    needs discussion
    on Dec 14, 2023
  2. Hexagon commented on Dec 17, 2023

    @Hexagon
    Author

    From version 2.0.0, croner defaults to POSIX-style, as it did in 1.0.0, but can optionally switch to Quartz-mode using the builder method .with_alternative_weekdays(). I'd really like to see Deno.cron use POSIX style by default, but have the option to switch to Quartz mode using an option in Deno.cron.

  3. self-assigned this
    on Dec 18, 2023
  4. Hexagon commented on Mar 24, 2024

    @Hexagon
    Author

    I just noticed that your documentation points to crontab.guru, which uses different weekday numbering compared to Deno.

    image

    image

  5. igorzi commented on Mar 26, 2024

    @igorzi

    Docs are updated.

  6. sanekb commented on Jul 3, 2026

    @sanekb

    Not too long ago, saffron was removed as a dependency (#34879), yet full support for the specific saffron cron syntax was retained in cron.rs.

    Because of this, I believe we should update the documentation in two places (one, two) that currently point to standard cron syntax conventions. We should explicitly state that the day-of-week field uses a 1-7 numerical range (similar to how it is documented in the Deploy Classic docs), which would finally clear up any confusion and close this issue.

    Thoughts on this, @bartlomieju?

  7. bartlomieju commented on Jul 6, 2026

    @bartlomieju
    Member

    Sure, PRs welcome

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    ext/cronneeds discussion

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions