Skip to content

refactor: migrate torrents table to completed_v1 with optimized schema #448

refactor: migrate torrents table to completed_v1 with optimized schema

refactor: migrate torrents table to completed_v1 with optimized schema #448

Triggered via push February 6, 2026 12:28
Status Failure
Total duration 2m 33s
Artifacts

testing.yaml

on: push
Formatting
27s
Formatting
Matrix: build
Matrix: Static Analysis
Matrix: Units
Matrix: E2E
Fit to window
Zoom out
Zoom in

Annotations

14 errors
Build on ubuntu-latest (stable)
Process completed with exit code 101.
Build on windows-latest (nightly)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
Build on windows-latest (nightly)
The operation was canceled.
Build on windows-latest (stable)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
Build on windows-latest (stable)
The operation was canceled.
Build on ubuntu-latest (nightly)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
Build on ubuntu-latest (nightly)
The operation was canceled.
Static Analysis (nightly)
Process completed with exit code 101.
Static Analysis (stable)
The strategy configuration was canceled because "check.nightly" failed
Static Analysis (stable)
The operation was canceled.
Build on macos-latest (stable)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
Build on macos-latest (stable)
The operation was canceled.
Build on macos-latest (nightly)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
Build on macos-latest (nightly)
The operation was canceled.