feat: add thread-safe pool allocator #7
ci.yaml
on: push
Matrix: build-linux
Matrix: build-macos
Matrix: build-windows
Annotations
7 errors
|
build-linux (Debug, gcc-13, g++-13)
Process completed with exit code 2.
|
|
build-linux (Release, gcc-13, g++-13)
The operation was canceled.
|
|
build-linux (Release, gcc-13, g++-13)
The strategy configuration was canceled because "build-linux.Debug_gcc-13_g__-13" failed
|
|
build-linux (Release, clang-16, clang++-16)
The operation was canceled.
|
|
build-linux (Release, clang-16, clang++-16)
The strategy configuration was canceled because "build-linux.Debug_gcc-13_g__-13" failed
|
|
build-linux (Debug, clang-16, clang++-16)
The operation was canceled.
|
|
build-linux (Debug, clang-16, clang++-16)
The strategy configuration was canceled because "build-linux.Debug_gcc-13_g__-13" failed
|